If all goes according to plan at Windshear Inc., North America will gain its first 180-mph rolling-road wind tunnel, which will also be the first commercially available full-scale, rollingroad wind tunnel of its type in the world.
The Single Belt FlatTrac model rolling-road tunnel will accommodate full-scale vehicles and provide constant air speeds to 180 mph with temperatures controlled to within 1 degree F. The tunnel’s high-tech rolling road, which will measure 10.5-ft wide and 29.5-ft long, will accelerate to top speed in less than one minute. And during testing, through-the-belt sensors measure the aerodynamic down force under each vehicle tire.
The “road” is a 1-mm-thick stainless steel belt designed to last about 5,000 operational hours. If a vehicle remained on the belt the entire 5,000 hours, it would have traveled, in reality, as much as 248,000 miles.